Module Overview
The Risk Management module provides a comprehensive risk register supporting both Traditional (Impact × Likelihood) and FMEA (Severity × Occurrence × Detection) methodologies. Risks are linked to strategic goals, KPIs, and controls for integrated risk management.
Why Risk Management Matters
Effective risk management is the cornerstone of organizational resilience. StrataGRC's risk register enables you to:
Identify Risks
Capture and categorize risks across your organization with structured assessment
Assess Impact
Quantify risk exposure using proven methodologies (Traditional or FMEA)
Link to Controls
Map risks to mitigating controls and track effectiveness
Monitor Trends
Track risk evolution over time with historical audit trail
Implementation Tip
Choose your risk methodology based on industry standards. Traditional method is simpler and widely used. FMEA provides more granular assessment, preferred in manufacturing, healthcare, and engineering sectors.
Risk Assessment Methodologies
StrataGRC supports two industry-standard risk assessment methodologies. Your organization's methodology is configured in Organization Settings.
Traditional Method
Two-factor risk assessment focusing on impact and likelihood. Simple, intuitive, and widely adopted.
Range: 1-25
| Factor | Scale | Description |
|---|---|---|
| Impact | 1-5 | Severity of consequences if risk occurs |
| Likelihood | 1-5 | Probability of risk occurring |
FMEA Method
Three-factor assessment from Failure Mode and Effects Analysis. More granular, preferred in engineering.
Range: 1-1000
| Factor | Scale | Description |
|---|---|---|
| Severity | 1-10 | Impact severity if failure occurs |
| Occurrence | 1-10 | Frequency of failure occurrence |
| Detection | 1-10 | Ability to detect before impact (10=undetectable) |
Traditional Method Details
Impact Scale (1-5)
| Score | Level | Financial Impact | Operational Impact |
|---|---|---|---|
| 1 | Negligible | < ₦100K | Minor inconvenience |
| 2 | Minor | ₦100K-500K | Localized disruption |
| 3 | Moderate | ₦500K-2M | Department affected |
| 4 | Major | ₦2M-10M | Multiple departments |
| 5 | Severe | > ₦10M | Organization-wide |
Likelihood Scale (1-5)
| Score | Level | Probability | Frequency |
|---|---|---|---|
| 1 | Rare | < 5% | Once in 10+ years |
| 2 | Unlikely | 5-20% | Once in 5-10 years |
| 3 | Possible | 20-50% | Once in 2-5 years |
| 4 | Likely | 50-80% | Once per year |
| 5 | Almost Certain | > 80% | Multiple times/year |
FMEA Method Details
Severity Scale (1-10)
| Score | Effect | Description |
|---|---|---|
| 1-2 | Minor | No impact on operations |
| 3-4 | Low | Minor disruption, easily recovered |
| 5-6 | Moderate | Moderate disruption, recovery possible |
| 7-8 | High | Significant disruption, difficult recovery |
| 9-10 | Very High | Catastrophic, recovery unlikely |
Occurrence Scale (1-10)
| Score | Frequency | Probability |
|---|---|---|
| 1-2 | Remote | < 1 in 100,000 |
| 3-4 | Low | 1 in 10,000 |
| 5-6 | Moderate | 1 in 1,000 |
| 7-8 | High | 1 in 100 |
| 9-10 | Very High | > 1 in 10 |
Detection Scale (1-10)
| Score | Detection Ability | Controls |
|---|---|---|
| 1-2 | Almost Certain | Multiple automated controls |
| 3-4 | High | Effective manual controls |
| 5-6 | Moderate | Some controls in place |
| 7-8 | Low | Limited controls |
| 9-10 | Remote | No controls, undetectable |
Detection Factor Note
Unlike Severity and Occurrence, higher Detection scores are worse. A score of 10 means the failure is undetectable before impact, while 1 means it will almost certainly be detected early.
Using the Risk Register
Create a New Risk
Navigate to Risk Register, click "Add Risk". Enter risk title, description, and category. Select your risk owner from the dropdown.
Assess Inherent Risk
Rate the risk using your organization's methodology:
- Traditional: Impact (1-5) and Likelihood (1-5)
- FMEA: Severity (1-10), Occurrence (1-10), Detection (1-10)
The system auto-calculates the inherent risk score.
Link to Strategic Goals (Optional)
If this risk impacts strategic objectives, link it to relevant strategic goals. This enables risk-aware strategy execution.
Link to KPIs (Optional)
Connect risks to KPIs they might impact. When KPI thresholds are breached, linked risks are automatically reassessed.
Set Risk Status
Track risk through its lifecycle:
- Identified: Risk logged, awaiting assessment
- Assessed: Risk scored, ready for response
- Response Required: Action plan needed
- In Mitigation: Controls being implemented
- Monitoring: Active monitoring phase
- Closed: Risk accepted or eliminated
Risk-Control Mapping
Linking Controls to Risks
Controls are measures that reduce risk. Mapping controls to risks enables you to:
- Track Mitigation: See which controls address which risks
- Assess Effectiveness: Monitor control test results
- Calculate Residual Risk: Risk remaining after controls
- Identify Gaps: Find risks without adequate controls
How to Link Controls
From Risk Detail Page
Open a risk, scroll to "Linked Controls" section. Click "Link Control", select from existing controls, and save.
View Control Test Results
Linked controls show their latest test result (Passed/Failed/Not Testable). This provides real-time insight into control effectiveness.
Unlink Controls
If a control no longer mitigates a risk, click "Unlink" to remove the mapping.
Integration Flow
When a control fails testing, the linked risk is automatically flagged for reassessment. This ensures risk registers stay current with control performance.
Mitigation Tracking
Risk Mitigation Tasks
Break down risk responses into actionable tasks. Each task can be assigned, tracked, and marked complete.
Assign Tasks
Assign mitigation tasks to specific users with clear ownership
Set Due Dates
Define deadlines and track overdue tasks automatically
Priority Levels
Set task priority (Low, Medium, High, Critical) for triage
Track Progress
Update task status from Not Started to Completed
Risk Response Workflow
Request Response
For risks requiring action, click "Request Response" and set a deadline. The risk owner receives notification.
Create Mitigation Tasks
Break down the response into specific, actionable tasks. Assign each task to responsible individuals.
Monitor Completion
Track task progress. When all tasks are completed, the risk status automatically updates to "Monitoring".
Update Risk Status
As mitigation progresses, update the risk status and action plan. All changes are logged in risk history.
Audit Trail
Every change to a risk (score updates, status changes, task completions) is logged in the risk_history table with timestamp and user. This provides complete accountability and regulatory compliance.
Module Integrations
How Risk Management Connects to Other Modules
Strategic Goals
Risks linked to strategic goals enable risk-aware strategy execution. Goal owners see risks that could impact their objectives.
KPIs
Two-way integration: KPI breaches trigger risk reassessment, and high risks can flag at-risk KPIs for monitoring.
Control Library
Risk-control mapping shows which controls mitigate which risks. Control test results inform residual risk assessment.
Audit Management
High risks can trigger audit engagements. Audit findings can create new risks or update existing risk scores.
Data Flow Example
Automated Updates
The system automatically updates risk scores when:
• Linked KPIs breach thresholds
• Linked controls fail testing
• Audit findings identify new issues
• Mitigation tasks are completed
Best Practices
Risk Management Guidelines
Use Consistent Methodology
Stick to one methodology (Traditional or FMEA) across your organization for comparability. Don't mix methods unless you have specific regulatory requirements.
Define Risk Criteria
Before assessing risks, define what each score means for your organization. Document impact and likelihood scales with concrete examples.
Involve Risk Owners
Risk owners should participate in assessment. They understand the business context and can provide realistic impact and likelihood estimates.
Link to Controls Early
Don't assess risks in isolation. Always identify and link existing controls to understand current risk exposure (residual risk).
Review Regularly
Risks evolve. Schedule quarterly reviews for high risks, annual for others. Update scores based on control performance and business changes.
Track Mitigation Progress
Use mitigation tasks to break down risk responses. Assign clear owners and deadlines. Monitor completion rates.
Compliance Standards Alignment
ISO 31000 Risk Management:
• Risk Identification: Systematic identification of risks affecting objectives
• Risk Analysis: Traditional and FMEA methodologies for risk assessment
• Risk Evaluation: Risk matrices and scoring for prioritization
• Risk Treatment: Mitigation tasks and action plans
• Monitoring & Review: Ongoing risk monitoring and reassessment
COSO ERM Framework:
• Governance & Culture: Risk governance structure and oversight
• Strategy & Objective-Setting: Risk integration with strategy
• Performance: Risk identification, assessment, and prioritization
• Review & Revision: Risk response and mitigation tracking
• Information, Communication & Reporting: Risk reporting and communication
ISO 14971 (Medical Devices):
• FMEA Method: Severity × Occurrence × Detection scoring
• Risk Control: Mitigation measures and effectiveness verification
• Production & Post-Production: Ongoing risk monitoring
King IV Report on Corporate Governance:
• Risk Governance: Board oversight of risk management
• Risk Appetite: Defined risk tolerance levels
• Integrated Assurance: Coordinated risk assurance activities
Additional Resources
For more detailed guidance, refer to ISO 31000 (Risk Management) or ISO 14971 (FMEA for Medical Devices) depending on your industry.